Universal Access To All Knowledge
Home Donate | Store | Blog | FAQ | Jobs | Volunteer Positions | Contact | Bios | Forums | Projects | Terms, Privacy, & Copyright
Search: Advanced Search
Anonymous User (login or join us)
Upload
Search Results
Results: 1 through 5 of 5 (0.002 secs)
You searched for: mediatype:texts AND collection:PresidioTrustLibrary AND subject:"Implementation"
[texts]Specifications Phase 1 Corrective Action Plan Implementation Commissary/PX Area Presidio of San Francisco - Geomatrix Consultants, Inc.
Project is to remove soil impacted with petroleum, metals, and polyaromatic hydrocarbons from five areas of the site. The site is located in the northern portion of the Presidio. Historic operation at the site included storage of supplies, equipment, and fuels to serve and maintain U.S. Army vehicles.
Keywords: environmental remediation; Commissary and Main Post Exchange; Commissary/Post Exchange; Former Motor Pool; Building 610; Crissy Field; Presidio Consolidated Motor Pool; soil contamination; groundwater contamination; petroleum contamination; hazardous materials; soil excavation; soil removal; corrective action plan implementation
Downloads: 107
[texts]Crissy Field Operable Unit 4 Implementation Report, Presidio of San Francisco, California - Erler & Kalinowski, Inc.
This Crissy Field Implementation Report was prepared to document remedial actions and request closure certification for the Crissy Field sites. This report also includes an assessment for each of the sites for unrestricted land use.
Keywords: environmental remediation; Crissy Field Operable Unit 4; Crissy Field; Building 933; Building 937; Building 923/937 Area; Building 979 Area; petroleum contamination; soil contamination; groundwater contamination; remedial action plan; implementation report; clsoure report; US Army; DTSC; use assessment; request for construction completion; request for site closure certification
Downloads: 216
[texts]Presidio of San Francisco Forest Management Plan 1990-2010 - Jones & Stokes Associates, Inc.
This forest management plan was prepared as a long-range management tool for army operation of the Presidio of San Francisco. The plan was developed with the cooperation and assistance of the staff of the Golden Gate National Recreation area. A process of public review and comment on a draft plan was planned along with coordination of an enviornmental document before the plan was finalized and adopted...
Keywords: forest management; vegetation management; vegetation history; presidio site conditions; wind; natural resources; geology; rainfall; wildlife habitats; windbreaks; native vegetation; view enhancement; forest management; natural hazards; landscaping; program implementation
Downloads: 551
[texts]Corrective Action Plan Implementation Work Plan Building 1349 Study Area, Presidio Trust, San Francisco, California - Blasland, Bouck, and Lee, Inc.
The CAP Work Plan presents the procedures for the implementation of the selected corrective action alternatives for shallow soil, deep soil, and groundwater for the Building 1349 Study Area. Corrective actions for each remedial unit were outlined in the Final Corrective Action Plan (Final CAP) for Building 1349 Study Area (BBL, 2006)
Keywords: environmental remediation; Building 1349; Building 1349 Area; Fuel Distribution System; implementation work plan; soil contamination; groundwater contamination; petroleum contamination; soil excavation; soil removal; groundwater monitoring; land use controls
Downloads: 253
[texts]Final Enviornmental Impact Statement Presidio Trust Management Plan Volume II Response to Comments - The Presidio Trust
Land Use Policies for area B of the Presidio of San Francisco
Keywords: purpose and need; environmental impact statement process; public involvement; vision; alternatives; history; archaeology; programmatic agreement; open space; water; biological resources; land use; visual resources; air quality; noise; new construction; housing; employment; lodging; programs; visitor experience; recreation; transportation; transit services; pedestrian and bicycle safety; parking; transportation demand management; Doyle Drive; water supply and utilities; schools; operations/financial comments; cumulative impacts; tenant selection; implementation; consultation and coordination
Downloads: 226
Advanced search

Group results by:

> Relevance
Mediatype
Collection

Related mediatypes

texts